Design, Supply, Installation & Commissioning of Court Lighting

Design, Supply, Installation & Commissioning of Court Lighting

Medina Netball – Design, Supply, Installation & Commissioning of Court Lighting

Future Power WA was awarded the tender for the supply and installation of four 12m lighting towers each fitted with two 1kW floodlights to provide 100 Lux lighting levels for the five Medina Netball Courts. The project also included the supply and installation of a new Site personnel had to take extra care when traversing the court surfaces so as to ensure they were not damaged due to the impact of heavy vehicles used for the erection of the poles and aiming of the light fittings. Future Power WA worked closely with the City of Kwinana throughout all stages of the project to ensue all stakeholder requirements were met.  The project was completed on time, on budget and without incident.

Orelia Oval Junior AFL Oval Sports Lighting

Future Power WA was awarded the tender to supply and install four 30m lighting towers each fitted with nine 2kW floodlights to illuminate the oval to 150 Lux for recreational AFL gameplay.

The design of the lighting for this project was engineered in conjunction with our long established suppliers to ensure that the lighting not only exceeded the minimum requirements, but would still meet the lighting levels required at the end of 5000 hours of operation.

The project involved:

  • Geotechnical investigation for the site and Engineering Certification for the foundations
  • Supply and installation of four 30m poles and foundations and thirty-six 2kW floodlights
  • Supply and installation of 600m of conduit and 3000m of cable, cable pits and surrounds
  • Supply and installation of one site switchboard and termination of all cables
  • Final testing and commissioning for the installation

The project was completed in an accelerated timeframe to meet funding requirements and restrictions to the complete satisfaction of the council representatives.  It was completed on time, on budget and without incident.