Future Power WA was engaged by Ramelius Resources to build a 6.5 kilometre 11kV powerline to supply power for their new Shannon Decline at the Mount Magnet Gold facility. The powerline encompassed seven underground road crossings and one underground spur to feed the decline that totalled 1800 meters in length.
During the construction phase, the powerline route was changed significantly due to additional ore deposits being located in the intended route. Future Power WA adopted and updated the changes with no disturbance to the scheduling of construction.
Due in part to the efficient manner of the construction, as well as the quality of work being done, the client engaged Future Power WA to conduct remedial works on their existing powerlines to ensure longevity of the installations. This work has been done continuously and in sequence with planned outages on the site to the total satisfaction of Ramelius Resources.